Forum Discussion
garryk6
Oct 25, 2016Explorer
Last nights work:
New flooring going in. Alure Ultra Travertine

Sink and Closet torn apart and going back together with new heater.

New Atwood 12000 btu furnace mounted in new framing and new closet floor next to propane cylinder box and sink where original refrigerator was located.



Adding new foam board insulation over the existing reflectix aluminized insulation.

Cover panel reinstalled over gas lines and insulation. both covers on the WAve-3 catalytic and the Atwood. and the floor finished to the door, but still have to do the bathroom and closet.

This is my water tank and water pump mounted to a removable board when work is needed or winterizing the pump.

This is my wiring distribution and battery compartment.


and this is the overhead bunk/ window and the new replacement window that will have to wait till next summer to install...

Till tomorrow...
Garry
New flooring going in. Alure Ultra Travertine

Sink and Closet torn apart and going back together with new heater.

New Atwood 12000 btu furnace mounted in new framing and new closet floor next to propane cylinder box and sink where original refrigerator was located.



Adding new foam board insulation over the existing reflectix aluminized insulation.

Cover panel reinstalled over gas lines and insulation. both covers on the WAve-3 catalytic and the Atwood. and the floor finished to the door, but still have to do the bathroom and closet.

This is my water tank and water pump mounted to a removable board when work is needed or winterizing the pump.

This is my wiring distribution and battery compartment.


and this is the overhead bunk/ window and the new replacement window that will have to wait till next summer to install...

Till tomorrow...
Garry
About Truck Camper Group
264 PostsLatest Activity: Dec 30, 2025