Forum Discussion
towpro
Apr 12, 2017Explorer
i replaced my 350W 15 year old MSW inverter with a 600w GoPower MSW inverter.
After replacement I was pleased to discover the reason my old inverter was going in overload was because the Bogart Engineering solar controller was charging around 15.5v (finish charge) which was over the "over voltage cutout level" for the old charger. Now the 350 can go back into under the seat in my pickup for charging laptops while going down the road.
and I turned down the Bogart a little so the new one don't go into over voltage cutout.
After replacement I was pleased to discover the reason my old inverter was going in overload was because the Bogart Engineering solar controller was charging around 15.5v (finish charge) which was over the "over voltage cutout level" for the old charger. Now the 350 can go back into under the seat in my pickup for charging laptops while going down the road.
and I turned down the Bogart a little so the new one don't go into over voltage cutout.
About Truck Camper Group
227 PostsLatest Activity: Feb 23, 2025