Jun 18, 2019Explorer
Well, today was the day my dad and I started. By the end of the day we got the AC mounted, new 50amp plug, and the AC side of the power distribution center wired. I ended up buying a new converter and pdc. Also, I'm adding a heat strip in the AC unit, and using a wall thermostat. My goal is to get this to look as close to factory as possible.
Getting the AC up, the easy way...
I had to modify the original 30amp mouse hole. I added in the new plug about the only way I could. The hole was to large to just use the 50amp plug. I made a bracket on the back and it seems solid.
Last, is where we stopped for the day. The AC side is wired, got to do the DC side, and put the new converter in. Very glad my dad was an electrical engineer and wired his house. I don't know where to begin with a lot of this.
I'll be back out in a few days. Hopefully we will be able to finish, if not, it may take an additional half day if everything goes ok.
Getting the AC up, the easy way...
I had to modify the original 30amp mouse hole. I added in the new plug about the only way I could. The hole was to large to just use the 50amp plug. I made a bracket on the back and it seems solid.
Last, is where we stopped for the day. The AC side is wired, got to do the DC side, and put the new converter in. Very glad my dad was an electrical engineer and wired his house. I don't know where to begin with a lot of this.
I'll be back out in a few days. Hopefully we will be able to finish, if not, it may take an additional half day if everything goes ok.