Almot wrote:
no transfer switch?
There's one for genny/shore power but I did not add another one. Don't need too.
EDIT: By using the shore cord, I'm still using the built-in transfer switch.
BFL13 wrote:
The two cords thing might be where each receptacle only does half the rated watts of the inverter. One inverter model has 1000w rating but each receptacle has a limit of 500w eg.
Many inverters will do the whole thing from one receptacle, but you have to read their manuals on-line to make sure, and even then IMO phone their tech support and try to pin them down on that topic, to be even more sure before buying that model.
X2, my Go Power 300W PSW inverter will do the whole 300W from one receptacle.