Forum Discussion
westend
Jan 03, 2013Explorer
Finally made a little progress on the solar wiring. I installed the conduit on the side of the Hilton that will hold the 4 ga. wires from the combiner box on top to the distribution panel and the controller, below. This was a tight fit because I had a stud in this location and wanted to bolt the conduit clamps to that stud. There also happened to be a 12-2 AC wire in the exact center of the bottom entrance. I managed to just nick the wire when drilling the first hole. A bit of OEM (Oops Engineer Modification) and all is well. ;)



I did remove a little too much paint around the bottom LB on the conduit but I'll touch that up on a warmer day. I've got to visit a couple of electrical distributors to pick up the rest of the wire and sundry bits, also need to make the mounting rack for the panel.



I did remove a little too much paint around the bottom LB on the conduit but I'll touch that up on a warmer day. I've got to visit a couple of electrical distributors to pick up the rest of the wire and sundry bits, also need to make the mounting rack for the panel.
About Travel Trailer Group
44,051 PostsLatest Activity: Oct 02, 2025