Forum Discussion
BobsYourUncle
Aug 06, 2016Nomad
I once replaced the entire floor in my TT.
Big job to do it right.
The floor sheeting goes all the way to the outside edge front to back.
I literally disconnected everything and jacked the entire walls roof everything up off the floor and replaced rotten joists and plywood in one piece edge to edge.
I used 5/8 T&G
Big job but it can be done.
Then I put new lino down, one piece all the way through front to back.
Then put the walls back down, partitions etc.
Big job to do it right.
The floor sheeting goes all the way to the outside edge front to back.
I literally disconnected everything and jacked the entire walls roof everything up off the floor and replaced rotten joists and plywood in one piece edge to edge.
I used 5/8 T&G
Big job but it can be done.
Then I put new lino down, one piece all the way through front to back.
Then put the walls back down, partitions etc.