Hence wrote:
We only paid a 1,000 for it and it came with some of the renovation supplies. The wood we need we have gotten free, except the 4 floor boards which will be about 100. and 2 ceiling panels and a roll of insulation to replace a few parts. We will also have to buy sealant for corners, windows and roof. and screws. We already have paint, tile and fabric for the upholstery and pretty much all the lights and appliances work. the frame is in good condition a long with wiring and venting. We have opened up the entire front wall and the ceiling where there was water damage. Also we already planned on replacing the back wall wood and insulation and most of the wood and some of the insulation on both sides. Is there something that we are
missing?
I would say that your not missing a thing. Be sure to take lots of pictures and post them as you are going through your rebuild - lots of people like following this kind of thread. Then you can stick around and help the next guy. This would be a great transfusion of knowledge in this forum. Check out the
Cowboy Hilton rebuild thread by user Westend - you may get some good tips.