Forum Discussion
Mr_Mark1
Jul 23, 2014Explorer
Rgatijnet1, our coach should be at the paint factory as the converter should have received it at the end of May. It takes a month to paint the exterior than back to the converter to made into a motorhome.
So, the rear end is already installed. The coach was driven from Canada as an empty shell with the four slides installed at the Prevost factory.
Whatever Prevost put in I'll just leave it as is as I wouldn't want to void the chassis or Volvo/Allison warranty's.
Learned a lot about Torque, RPM's and HP... thanks everybody.
MM.
So, the rear end is already installed. The coach was driven from Canada as an empty shell with the four slides installed at the Prevost factory.
Whatever Prevost put in I'll just leave it as is as I wouldn't want to void the chassis or Volvo/Allison warranty's.
Learned a lot about Torque, RPM's and HP... thanks everybody.
MM.
About Motorhome Group
38,705 PostsLatest Activity: Jan 24, 2025