Forum Discussion
Ocean_Mist
Jun 18, 2017Explorer
Hey Mike,
The Seller checked all the issues that were found on the Executive when he got home and he was pissed because he said they were ALL BS!
He said he saw the oil on the shock, and I told him if theres oil the shock is blown...
He says no it could be road grime, and that he takes very good care of his things.
He checked all over and even went so far as to make a video of the oil areas and they were all dry.
He said the other things were maintenance issues and that we are not buying a new MH
So, we asked if he would meet us half way on the $6k and he blew his stack saying that the Redlands people didn't know what they were talking about.
He said there's other people waiting and he knows he has the best rig in the DP 4' market.
so, we scoured the market and the DW still wants this one...
2006
MONACO
EXECUTIVE
ROADMASTER
1R
Redlands Truck & RV
510 Amigos Drive
Redlands, CA. 92373
fax
Hazardous Waste EPA# CAL 00003732
Phone Log:
free
www.RedlandsTruckService.com
test
Qty Price Labor Tech
Labor and Service Description
Ext
Job Id 1: PRE-PURCHASE INSPECTION 540.00 JG
LABOR TO PERFORM A PRE-PURCHASE INSPECTION
-NEW BUYERS SPECIFIC AREAS OF CONCERN
-OIL/FUEL LEAKS
-ROOF CONDITION
-STEERING GEAR BRAND TRW OR SHEPPARD
-TYPE OF EXHAUST, THIS COACH DOES NOT HAVE DPF
EXHAUST
-RADIATOR IMPACTION
Total for Sub Order: 540.00
NOTES FROM TECH INSPECTION
-TIRES DATED 17-2016
-TIRE PRESSURE
-ALL AXLES 105 PSI
2909.31
2901.65
Tax
141.13
233.31
Shop Fee
6185.40
Parts
Subtotal
5810.96
Balance Due $6185.40
-TIRE SIZE 295/80R22.5 YOKOHAMA
-STEERING GEAR IS A TRW TAS-85
-EXHAUST IS A TRADITIONAL NON DPF SYSTEM
-FUEL LEAK AT LIFT PUMP AREA
-REAR WHEELS HAVE STANDARD INFLATION
EXTENSIONS, RECOMMEND DUALLY VALVES
-ROCK CHIP IN WINDSHIELD
-ROOF SEALANT CRACKING AROUND SKYLIGHT. WHOLE
ROOF COULD USE A TOUCH UP ON SEALANT
-HOUSE BATTERIES ARE CORRODED, BARELY PASS A
HYDROMETER TEST
-ONE RIGHT FRONT SHOCK IS LEAKING, BUSHINGS ARE
CRACKING ON OTHER SHOCKS
-GENERATOR HAS AN OIL LEAK
Job Id 3: GENERATOR OIL LEAK 447.00
LABOR TO DIAGNOSE CAUSE FOR GENERATOR OIL LEAK
-DIAGNOSE TO DETERMINE REPAIR COST: 467.00
Job Id 4: LIFT PUMP 268.20
LABOR TO REPLACE LEAKING LIFT PUMP ASSEMBLY
-STEAM CLEAN AFFECTED AREA WHEN COMPLETED
430879
1.00 652.35 652.35
LIFT PUMP, TRANSFER Total for Sub Order: 950.97
Job Id 5: ROOF SEALANT 596.00
LABOR TO CLEAN, SCRAPE AND RESEAL ROOF WHERE
CRACKING SEALANT IS PRESENT
13-1315
4.00 17.88 71.52
ROOF SEALANT, DICOR, SELF LEVELING, WHITE
Total for Sub Order: 676.15
667.52
Job Id 6: SHOCKS
268.20
LABOR TO REPLACE 4 FRONT SHOCKS WITH KONI FSD'S
1)
8805-1004
4.00 189.00 756.00
SHOCK, FRT FSD MONACO Total for Sub Order: 1115.37
1024.20
Job Id 7: BATTERIES
596.00
LABOR TO REPLACE HOUSE BATTERIES.
-STEAM CLEAN CAMPARTMENTS DUE TO HEAVY
CORROSION
-REMOVE OLD BATTERIES
-CLEAN & TREAT BATTERY COMPARTMENT
-CLEAN & COAT CABLES
-UNDERCOAT TRAY
-INSTALL NEW BATTERIES
186.25
LABOR TO REPLACE CHASSIS BATTERIES.
-REMOVE OLD BATTERIES
-CLEAN & TREAT BATTERY COMPARTMENT
-CLEAN & COAT CABLES
-INSTALL NEW BATTERIES
T-105LPT-M
4.00 199.95 799.80
BATTERY - 6 VOLT DEEP CYCLE
13-0602
1.00 17.95 17.95
BATTERY CORROSION PREVENT SPRAY
13-0605
1.00 6.89 6.89
BATTERY CORROSION CLEANER
HAZ
1.00 20.00 20.00
HAZARDOUS WASTE FEE
264
1.00 24.95 24.95
UNDERCOATING, BLACK
1131MF
3.00 179.95 539.85
BATTERY, 950CCA,STUD POST 30M GROUP 31
Total for Sub Order: 2359.26
TOTAL $6185
The Seller checked all the issues that were found on the Executive when he got home and he was pissed because he said they were ALL BS!
He said he saw the oil on the shock, and I told him if theres oil the shock is blown...
He says no it could be road grime, and that he takes very good care of his things.
He checked all over and even went so far as to make a video of the oil areas and they were all dry.
He said the other things were maintenance issues and that we are not buying a new MH
So, we asked if he would meet us half way on the $6k and he blew his stack saying that the Redlands people didn't know what they were talking about.
He said there's other people waiting and he knows he has the best rig in the DP 4' market.
so, we scoured the market and the DW still wants this one...
2006
MONACO
EXECUTIVE
ROADMASTER
1R
Redlands Truck & RV
510 Amigos Drive
Redlands, CA. 92373
fax
Hazardous Waste EPA# CAL 00003732
Phone Log:
free
www.RedlandsTruckService.com
test
Qty Price Labor Tech
Labor and Service Description
Ext
Job Id 1: PRE-PURCHASE INSPECTION 540.00 JG
LABOR TO PERFORM A PRE-PURCHASE INSPECTION
-NEW BUYERS SPECIFIC AREAS OF CONCERN
-OIL/FUEL LEAKS
-ROOF CONDITION
-STEERING GEAR BRAND TRW OR SHEPPARD
-TYPE OF EXHAUST, THIS COACH DOES NOT HAVE DPF
EXHAUST
-RADIATOR IMPACTION
Total for Sub Order: 540.00
NOTES FROM TECH INSPECTION
-TIRES DATED 17-2016
-TIRE PRESSURE
-ALL AXLES 105 PSI
2909.31
2901.65
Tax
141.13
233.31
Shop Fee
6185.40
Parts
Subtotal
5810.96
Balance Due $6185.40
-TIRE SIZE 295/80R22.5 YOKOHAMA
-STEERING GEAR IS A TRW TAS-85
-EXHAUST IS A TRADITIONAL NON DPF SYSTEM
-FUEL LEAK AT LIFT PUMP AREA
-REAR WHEELS HAVE STANDARD INFLATION
EXTENSIONS, RECOMMEND DUALLY VALVES
-ROCK CHIP IN WINDSHIELD
-ROOF SEALANT CRACKING AROUND SKYLIGHT. WHOLE
ROOF COULD USE A TOUCH UP ON SEALANT
-HOUSE BATTERIES ARE CORRODED, BARELY PASS A
HYDROMETER TEST
-ONE RIGHT FRONT SHOCK IS LEAKING, BUSHINGS ARE
CRACKING ON OTHER SHOCKS
-GENERATOR HAS AN OIL LEAK
Job Id 3: GENERATOR OIL LEAK 447.00
LABOR TO DIAGNOSE CAUSE FOR GENERATOR OIL LEAK
-DIAGNOSE TO DETERMINE REPAIR COST: 467.00
Job Id 4: LIFT PUMP 268.20
LABOR TO REPLACE LEAKING LIFT PUMP ASSEMBLY
-STEAM CLEAN AFFECTED AREA WHEN COMPLETED
430879
1.00 652.35 652.35
LIFT PUMP, TRANSFER Total for Sub Order: 950.97
Job Id 5: ROOF SEALANT 596.00
LABOR TO CLEAN, SCRAPE AND RESEAL ROOF WHERE
CRACKING SEALANT IS PRESENT
13-1315
4.00 17.88 71.52
ROOF SEALANT, DICOR, SELF LEVELING, WHITE
Total for Sub Order: 676.15
667.52
Job Id 6: SHOCKS
268.20
LABOR TO REPLACE 4 FRONT SHOCKS WITH KONI FSD'S
1)
8805-1004
4.00 189.00 756.00
SHOCK, FRT FSD MONACO Total for Sub Order: 1115.37
1024.20
Job Id 7: BATTERIES
596.00
LABOR TO REPLACE HOUSE BATTERIES.
-STEAM CLEAN CAMPARTMENTS DUE TO HEAVY
CORROSION
-REMOVE OLD BATTERIES
-CLEAN & TREAT BATTERY COMPARTMENT
-CLEAN & COAT CABLES
-UNDERCOAT TRAY
-INSTALL NEW BATTERIES
186.25
LABOR TO REPLACE CHASSIS BATTERIES.
-REMOVE OLD BATTERIES
-CLEAN & TREAT BATTERY COMPARTMENT
-CLEAN & COAT CABLES
-INSTALL NEW BATTERIES
T-105LPT-M
4.00 199.95 799.80
BATTERY - 6 VOLT DEEP CYCLE
13-0602
1.00 17.95 17.95
BATTERY CORROSION PREVENT SPRAY
13-0605
1.00 6.89 6.89
BATTERY CORROSION CLEANER
HAZ
1.00 20.00 20.00
HAZARDOUS WASTE FEE
264
1.00 24.95 24.95
UNDERCOATING, BLACK
1131MF
3.00 179.95 539.85
BATTERY, 950CCA,STUD POST 30M GROUP 31
Total for Sub Order: 2359.26
TOTAL $6185
About Motorhome Group
38,707 PostsLatest Activity: Feb 13, 2025