I only have a 19' Jayco hybrid TT at the moment.
I think what I will do is back fill pit run according to the currently planned floor height. Then I can do a trial run and back the trailer in and pull it back out.
If there are issues, I can raise the floor another foot or maybe even 18" if needed.
Should be safe, as that exercise would be done on the gravel, which is 4-6" below the actual final floor height once the concrete is poured.
I think what I will do is back fill pit run according to the currently planned floor height. Then I can do a trial run and back the trailer in and pull it back out.
If there are issues, I can raise the floor another foot or maybe even 18" if needed.
Should be safe, as that exercise would be done on the gravel, which is 4-6" below the actual final floor height once the concrete is poured.