Forum Discussion
bpounds
Apr 22, 2015Nomad
I used these:
eBay LED lamps
I'm happy with the color, but you can get similar in warm, cool, and maybe blue.
The leads are a little long, but that's because they come with different socket adapters, and also insures the leads will be long enough for any fixture. I just curled up the excess.
The ones I bought came with double sided tape, and I just stuck the boards against the fixture reflector plate. So far the tape is holding, but I doubt it will last forever. I figure I will just put a plastic wire tie around them if needed someday.
Sorry, did not shoot a pic of these.
eBay LED lamps
I'm happy with the color, but you can get similar in warm, cool, and maybe blue.
The leads are a little long, but that's because they come with different socket adapters, and also insures the leads will be long enough for any fixture. I just curled up the excess.
The ones I bought came with double sided tape, and I just stuck the boards against the fixture reflector plate. So far the tape is holding, but I doubt it will last forever. I figure I will just put a plastic wire tie around them if needed someday.
Sorry, did not shoot a pic of these.
About Fifth Wheel Group
19,042 PostsLatest Activity: Dec 14, 2025