We went through in March. There was a lot of repaving going on then, the biggest issue was waiting for the flaggers to let us pass. At the city of Durango side we waited (on a motorcycle) in the hot sun for about 45 minutes at one spot. Most of the work was done on the State of Durango part. The Sinaloa end appeared to have been paved better originally than the Durango end. Repaving was being done simultaneously at a dozen different locations. I would assume by now, the way the work was being done that the road is by now freshly repaved.