I need some advice here. I have a 2005 Four Winds 29q bumper-pull travel trailer that I am adding a 200-watt solar system to this weekend.
I am ready to mount the panels and route the wiring, but since my batteries are on the tongue I need to mount my charge controller nearby in the forward storage. So I can't really mount the panels in the rear and utilize an existing vent.
I think I'll need to mount them towards the front and drill a hole to drop cables. Does this sounds like a good plan? I understand you want to minimize the long cable runs especially between the charge controller and the batteries, but also overall.
Also, if I go this route, are there diagrams available online that would show me stud locations and help me pick a good route, or should I just go with a stud-finder and have at it?
Any help or advice would be appreciated. I understand the solar setup quite well, but I need some wire routing advice.
Thanks!