I'm uncertain as I've personaly haven't really have had a need to run an inverter while off-grid and don't really have much experience with inverters.
I have run a few power tools and electric motors using an inverter, which is one reason why I have the trip-lite 2000/4000 watt as it's designed for more heavy duty electronics with motors, etc.
However I did run across this discussion from solar-electric.com. Here's part of the discussion where a person was having problems with a trip-lite inverters.
The discussion also includes solar arrays so this problem may not directly pertain to an off-grid systems without renewable power.
I have thought about expanding my solar for off-grid use however because of the initial cost factor and my weather environment it would take years in my current environment for a solar system to pay off, and the solar array would need to be much larger than a typical solar systems installed in more arid environments. However since deserts and desert forest are exponentially expanding my area may soon have more sunlight and less rain. Essentially the forest around me approx. 100 years ago the average age was 750 years, today I believe most of the forests are under 100 years where much of the forest are around 20 to 40 years.
I believe there's a direct link to the disappearance of old growth forests and the annual increase of forest fires in the Western US and elsewhere on the planet. Old growth forest as actually worth much more than the actual use and profit derived from them.
1. Old growth allowed many areas in the US and around the world to recover from drought which they can no longer due to it's disappearance. 2. old growth forest was at one time comprised of diversified tress and undergrowth which had natural defenses against various diseases, insects, etc. Monolithic forest as seen today e.g. Canada, Alaska and the Northwest were replanted with a single species such as Douglas Fir which made the vulnerable. Much of the existing replanted forests are turning brown, the only defense is to spray them with chemicals which really doesn't work very well
Research and Resources on the Negative Effects of Pesticide and Aerial SprayToxic Forest Fire Retardant Threat to Wildlife===== solar electric discussion
Re: Tripplite UPS Modified or Pure Sinewave
As an update the so called Electrical and Mechanical Engineer. He eventually withdrew the 36v MSW Tripplite Unit and replaced it with a Tripplite Pure sinewave 48v 6 kw Unit. At Tripplites expense according to the Installer. However the unit can only be configured by dip switches and the two charging options were approximately 27 amps or 95 amps. at 48v DC .Not much of an option .
To cut a long story short the new unit wouldn't sync with any generator for more than 15 minutes at a time the customers battery bank was down at 43/45 volts at best and they were already to sell up and go back to the Uk.
He was running his 4.5kva generator 9 to 12 hours a day. I went to see them at the request of his neighbor (My Friend) and found that although he replaced the 36v Triplite MSW with a 48v Pure Sine wave, he hadn't altered the 36v Nominal PV array to 48v. thus his 800w array was doing nothing. I loaned him an Xantrex C40 rewired his array to 60 volt to allow for a 75m wire run with substandard wire and put him on a strict recharge programed to get his batteries up.
He made enquiries with Tripplite and they confirmed my suspicions that they do not currently make an offgrid (generator based) inverter all there Inverters are for grid connection only. (UPS)
Again keeping it short. A summary of the next 4 weeks of nearly 12 hours /7 days a week genny run time he had with solar assistance got his batteries back to 52/53v when I installed a VFX3048E inverter and a MX60 CC. In 4 hours genny runtime his batteries hit 57.6 volts . He was gobsmacked. Over the last 2 weeks he has with genny assistance completed a full 90 min absorb cycle daily and has averaged about 2 hours runtime daily. He is now monitoring his saved batteries and reducing his genny runtime to get three full absorb cycles per week. He intends to increase his PV capacity by a further 40%.
This has been my first professional install and to not get any phone calls for problem shooting or hey my lights have just gone off in two weeks since commission and see smiling faces has been a joy . I turned up to day to pick my install fees. PS this was a complete new install with new outback gear and not related to my s/h VFX3048E teething problems from the other day. Im not posting this to blow my own trumpert because the original idiot installer (who has done a runner) and is the Villain of the post.
My purpose of this post is to thank all the great members of NAWS who have helped me over the last couple of years in developing a sound base of off grid installations I really enjoy my work. Thanks to every one. Nigel
------