Frame it with 2 x 4, put down plastic to hold down the weeds, and fill it with #8 limestone. Forget the concrete. At some point in the future you could probably take away the wood. Every couple of years add some more limestone.
โJul-09-2017 06:02 AM
โJul-09-2017 05:48 AM
โJul-08-2017 10:09 PM
โJul-02-2017 11:50 AM
โJul-02-2017 11:15 AM
โJul-02-2017 10:36 AM
โJul-02-2017 10:27 AM
Basic question: Do you think it would be OK If I box it in with 2x6 and pour 6" with pressure cracks every 5' with a 1" slope for rain water to run totally away from the house.
โJul-02-2017 10:24 AM
darsben1 wrote:Yep, right on all points. It's cheaper to do it right than doing it OVER and Over and over....
NO!
It will look bad fairly quickly.
Ground heave because of sub-concrete moisture will do you in. Specially on Clay soil.
Do you think companies would go to all the trouble of doing site prep if it was not necessary.
See
http://web.mit.edu/parmstr/Public/NRCan/CanBldgDigests/cbd026_e.html